
Line Striping
Professional parking lot striping that lasts. We use traffic-grade paints and precision equipment to create clear, durable markings that maximize your parking capacity and keep you ADA compliant.
What We Offer
Professional line striping services tailored to Utah properties. Expert solutions backed by years of experience.
Parking Stall Layout
Maximize parking capacity with efficient stall layouts. We design configurations that optimize traffic flow and vehicle capacity for your specific lot.
ADA Compliance
Stay compliant with proper accessible parking spaces, van-accessible stalls, access aisles, and required signage placement.
Fire Lane Markings
Clear fire lane striping in required red with proper lettering. Keep your property compliant with fire codes and emergency access requirements.
Directional Arrows
Guide traffic flow with clear directional arrows, turn indicators, and lane markings that reduce confusion and prevent accidents.
Custom Stenciling
Reserved parking, company logos, numbered spaces, and custom messaging. We create stencils for any marking need.
Traffic-Grade Paint
We use only commercial traffic-grade paints designed for durability. Our markings withstand Utah's harsh UV exposure and heavy traffic.
Benefits of Professional Line Striping
Service Areas
We provide line striping services throughout the Wasatch Front:
How It Works
Simple, transparent process from initial contact to completed project.
Layout Planning
We measure your lot and design optimal layouts considering traffic flow, ADA requirements, and maximum capacity.
Surface Prep
Old markings are removed or covered as needed. Surfaces are cleaned and prepped for new paint adhesion.
Precision Striping
Using professional striping equipment, we apply traffic-grade paint with straight lines and consistent coverage.
Final Inspection
We verify all markings, install any needed signage, and ensure ADA compliance before opening to traffic.
Common Questions
Most parking lots can be striped in one day. A typical 50-space lot takes 4-6 hours. Larger lots or complete re-layouts may take longer. We typically work during off-hours to minimize business disruption.
Traffic-grade paint typically dries to touch in 30 minutes and is ready for vehicle traffic in 1-2 hours depending on temperature and humidity. We'll let you know the exact timing for your project.
ADA requirements are based on total parking spaces. Generally: 1-25 spaces need 1 accessible space, 26-50 need 2, 51-75 need 3, and so on. At least one must be van-accessible. We ensure full compliance.
Yes, if the existing layout works well, we can paint over faded lines. If you're changing the layout or markings are heavily worn, we may need to remove old paint first for the best results.
In Utah's climate, parking lot striping typically needs refreshing every 18-24 months for high-traffic lots. Lower-traffic areas may last 2-3 years. We recommend re-striping after every seal coating.
Related Services
Explore our other professional property services
Ready to Transform Your Property?
Contact us today for a free line striping estimate. We will assess your property and provide a customized quote within 24 hours.

